SL PO/Work Order/Contract No Customer Name Scope of Work Work Status [Completed/Ongoing]
1 PO#1190/SCA/HB/SB/01 AL-MUDHEEFA Testing & Commissioning Completed
2 PO#HUTC-PO-049-2015 AL-HANA HV Test for 11 kV cables Completed
3 PO#L&T/KUW/MEW/C/4737/LOA-SITE/016 L&T Testing & Commissioning of Electrical equipments. Completed
4 PO#3796501058 ABB Supply of Protection engineers- Completed
5 PO#3796500956 ABB Supply of Protection engineers- Completed
6 PO#3796500871 ABB Supply of Protection engineers- Completed
7 PO#3796500935 ABB Supply of Protection engineers- Completed
8 PO#3796500916 ABB Supply of Protection engineers- Completed
9 PO#3196502019 ABB Oil filtration of 3 MVA transformer Completed
10 PO#147734 ELECNOR Relay Testing Completed
11 PO#55000070 NSH 11 Cable termination & testing Completed
12 PO#55000085 NSH Testing of 2.6MVA Transformer & LV Switchgear Completed
13 LP0 054 ABB CMC-356 Completed
14 PO#46039 AL-GHANIM Testing & Commissioning Works for Electrical Systems at Subaiya Completed
15 PO#I19855 IMCO HV Test for 33 kV cables Completed
16 PO/CG-0716-106 EL-SWEDY HV Test for 33 kV cables Completed
17 PO/CG-0816-111 EL-SWEDY HV Test for 33 kV cables Completed
18 LP0 054-R1 ABB CMC-356 Completed
19 LP0 054-R2 ABB CMC-356 Completed
20 PO#55000252 NSH HV Test for 11 kV cables Completed
21 PO#300184307 NBTC HV Test for 11 kV cables Completed
22 PO#L&T/KUW/KNPC/LOA-SITE/037 L&T Testing & Commissioning, remote end modification, and load shifting work.-MAA20 Completed
23 PO#CC-1161A-PO-112 AL-MEER HV Test for 11 kV cables Completed
24 LPO:5001688 TNB-REMACO Transformer testing Completed
25 PO#CC-1161-PO-219 AL-MEER HV Test for 11 kV cables Completed
26 PO#SHR/LPO/0645/18 SAHARA SWG. Relay Testing Completed
27 PO#00058-007-0 TSK Relay Testing Completed
28 PO#00058-0113-0 TSK Relay Testing Completed
29 LPO-0481-18-REV-01 AL-AHELIEA Testing & Commissioning of Electrical equipments Completed
30 LPO-235 R1 ABB Supply of Protection engineers- Completed
31 PO-55363 AL-GHANIM Testing & Commissioning of Transformers, Motors, Switchgears.. OCGT-01 Completed
32 PO#MEW/C/4988-2015/2016 EL-SWEDY Testing and Commissioning Works of Univ ‘J’ and Univ ‘H’ 132/11kV Substations – Kuwait University Completed
33 PO#000580-0177-0 TSK Ground impudence Completed
34 PO#NSH-PO:55001727 NSH CT testing Completed
35 PO#OS/KW/PO-18010 NILE POWER 100 kV High volt testing Completed
36 PO#PC/ENS/2019/0109 PWER CORP CPC -100 Completed
37 PO#NSH-PO:55000070 NSH Capacitor bank testing Completed
38 LPO:5002435 TNB-REMACO Transformer testing Completed
39 PO:#MD/ES/1011/303 C AL MUTAIFA SFRA test Completed
40 PO#4500001954 AZN Transformer replacement Completed
41 LPO 241 ABB Oil BDV Completed
42 PO#GWTC/PO12/130319 Genuine world Tan delta Completed
43 PO#372000339 GE CMC rent with operator Completed
44 PO#372000340 GE Generator hipot Completed
45 PO#LPO/T&C AL-NUBALAA HV Test for 33 kV cables Completed
46 PO#4201920420 ABB Tan delta testing Completed
47 PO#92532 AL-BAHAR DG protection system testing Completed
48 PO#MD/ES/0320/304C AL-MUDHEEFA Protection engineers supply Completed
49 PO#TBEA/ESC/5027/OD/19/001 TBEA HV Test for 33 kV cables Completed
63 074300/B/017 Kharafi National Construction, Erection, Assembly, Installation, Termination, Testing & Commissioning of the LV Electrical Power Systems, Cable Pulling & Cable Trays including Equipment Works - Kuwait University Completed
64 L&T/KUW/MEW/C /4737/LOA-SITE/012 Larsen & Toubro Limited Electrical Erection works for 3 Nos. of 132/11kV Substations (7X, 13Y & 14Y) Completed
65 44546 Alghanim International Cable Pulling, Laying, Dressing/Termination, Connections & Testing Works for MV, LV, Fibre Optic and I&C-Cables at Subaiya OCGT-2 Power Station Completed
66 3796500939 ABB Erection & Installation of 2x400kV GIS Bays at Sabiya OCGT2 Power Plant Completed
67 2015TD/V-03-045-41 Shanghai Electric Installation/Erection Works for Fahli ''D'' 132/11kV Substation Completed
68 I20559 IMCO Electrical Erection Works for one 132/11kV substation Completed
69 P1146/SC164 Consolidated Contractors Company W.L.L(CCC) Splicing, Termination & Testing for HV/MV Cables Completed
70 MEW/C/4988-2015/2016 Elsewedy Electric Erection, Testing and Commissioning Works for Univ ‘J’ and Univ ‘H’ 132/11kV Substations – Kuwait University Completed
71 LPO/0390/18 Al Ahleia Switchgear Co. Electrical Erection works for WABM ‘1D’ 132/11kV Substation Completed